Skip to main content

Add a final report and details of the project for later analysis. 

  1. Go to the details Added Fields & Final Report tab. A final report can only be entered once the project has been finished (no earlier than the last day).
  2. The detailed fields of the final report are defined according to operational requirements.
  3. Entering the final report has no direct effect on the status of the project. To finalise a project, the Status must be changed manually on theprojekt General tab.