Links between schedule itemsM and segmentsM are to be solved again without any problems.
In the flow, right-click > Unlink to break the link between the flow point and the process.
Sowohl Ablaufpunkt als auch Vorgang bleiben unverändert. Note: If the link is broken, changes from the process are no longer transferred to the operation.
Save your input by clicking on the icon in the top left-hand corner of the input window.