Skip to main content

Links between schedule itemsM and segmentsM are to be solved again without any problems.

  1. In the flow, right-click AngebotEntfernen Unlink to break the link between the flow point and the process.
  2. Sowohl Ablaufpunkt als auch Vorgang bleiben unverändert.
    Note: If the link is broken, changes from the process are no longer transferred to the operation.
  3. Speichern Save your input by clicking on the icon in the top left-hand corner of the input window.