Skip to main content

Changed segment data is automatically transferred to the event schedule.

  1. Change data such as date, time or rooms in the Angebot process at Angebot base.
  2. Speichern Save your input by clicking on the icon in the top left-hand corner of the input window.
  3. Der Ablauf wird automatisch aktualisiert.

General note: The time of process points can be outside the regular event time (e.g. for set-up or dismantling, delivery, etc.). However, this does not apply to individual operation times; these must always be within the event time. It is only possible to link a schedule and an operation if the schedule point is within the event time.